
Installation
4 3A1215C
Installation
Mount Programmable Skipline
Control
Place the Control in a position that is comfortable and
easy to use. If you decide to mount the control, mount
the 0.50” (13mm) wide mounting bracket to a solid loca-
tion.
Connect the Control Cable
Clean all connections of dirt, burrs, moisture, et. before
connecting them to the system.
Operation
General
• All adjusted values remain in memory during power
down.
• UP/DOWN: Numbers change faster when button is
pressed for more than 2 seconds.
• Standard numbers are adjustable to 1/10 foot.
• Metric numbers are adjustable to 1/50 meter.
• NOTE: The controller must be calibrated in the units
that you desire to use.
• Paint and cycle length are adjustable from 0.0 to
999.9 feet. or 0.0 to 99.99 meter.
• Footage counters read out to 999,999.
• BEAD ON/OFF and PAINT ON/OFF delays are
adjustable.
• Pump output constant is adjustable from 0.0000 to
0.9999 gallons (liters)/stroke.
To reduce the risk of serious injury, mount the
Skipline Controller where it is easily visible and will
not interfere with your view of the road. It should take
no longer to look at the controller than it does to look
at a rear-view mirror.
To reduce the risk of serious injury, make sure that
the Skipline Controller is turned OFF whenever you
service any part of the RoadLazer system or leave
the RoadLazer unattended.
Comentários a estes Manuais